Projects

Westlake Pedestrian Bridge Jacking and Cable Stay Tensioning Adjustment

Owner:
Skyline Partners

Contract Value:
$696,593.00

Our Role:
Subcontractor – Shoring installation, bridge jacking, Cable tensioning oversite

Date:
June – July 2024

Scope:
The cable stayed pedestrian bridge spans Westlake Avenue. The bridge (constructed by others) had experienced movement and subsequently the cable stayed structure required adjustment. To accomplish this, ZCC install temporary shoring and temporarily raised the bridge to allow the cable stays to be re-tensioned to their design loads.


SR 500 Interchange Improvements Project

Owner:
WSDOT

Contract Value:
$5,322,866

Our Role:
Subcontractor – Bridge Structures

Date:
2011-2012

Scope:
Construct 4 highway bridges including 2 each 11’ deep steel plate girder bridges with clear spans of 240’. The steel plate girders were installed over a deep ravine using a combination of temporary support structures and three crane picks involving 500 ton capacity cranes.


Dungeness River Bridge Project

Owner:
James Town S’Klallam Tribe

Contract Value:
$1,231,475.00

Our Role:
Subcontractor – Bridge Structure

Date:
July – September 2022

Scope:
Construct concrete substructure footings, abutments and columns. Superstructure scope included assembling owner-furnished steel for the five span bridge. This included assembly and erection of two prefabricated steel truss 145’ spans.


Eastrail Northup Way Connector Bridge Project

Owner:
Eastrail Partners & King County a Public Private Partnership

Contract Value:
$1,739,543.00

Our Role:
General Contractor

Date:
Design Assist 2022, Construction 2023

Scope:
Assist with design and budgeting; construct 390 LF Structural Steel 19 span bridge on steep side slope between Northup Way and the Eastrail pedestrian bicycle corridor. The steep slope and the presence of low overhead utilities necessitated several innovations to transport and erect the structural components utilizing, dollies, rollers and winches.


Washington State Convention Center Addition

Owner:
Washington State Convention and Trade Center

Contract Value:
$8,208,800.00

Our Role:
Subcontractor – Structural and Misc Steel

Date:
10/2019 through 4/2023

Scope:
Erect Structural and Specialty Steel. Initial scope on the project involved construction of a temporary structural steel work protection deck designed to protect vehicle traffic while the new building was constructed over the I-5 express lanes and main line SB I-5. This 7,000 SF deck involved placement of steel beams that cantilevered more than 50% of their length. The structure was then decked and maintained for a period of 4 years while the Convention Center was constructed above. Following construction of the building the work deck was removed at night working from the Express lanes and mainline I-5 in restricted work windows that required careful planning. Building upon that successful installation, ZCC was awarded an additional 160 task order scope additions to construct technical steel installations in and around the new building utilizing ZCC’s in-house ironworker crews.


Mill Creek – 76th Avenue S.

Owner:
City of Kent

Contract Value:
$4,142,570.00

Our Role:
Subcontractor – Bridge and Retaining Wall Structures

Date:
6/2024 through 6/2025

Scope:
Construct one structural steel bridge, two precast bridges, walls.


Phillip Arnold Park

Owner:
City of Renton

Contract Value:
$532,619

Our Role:
Subcontractor – Erect concrete piers and voided slab boardwalk.

Date:
2022 – 2023

Scope:
Construct Elevated Concrete Boardwalk and Picnic shelters.


Little Bear Creek

Owner:
WSDOT

Contract Value:
$1,025,254

Our Role:
Subcontractor – Bridge Contractor

Date:
2016 – 2017

Scope:
Constructed a 5 lane buried bridge with 40 pieces of precast voided slabs set with 2 cranes in a 155hr weekend closure.


Loutsis Creek Fish Passage

Owner:
WSDOT

Contract Value:
$1,025,254

Our Role:
Subcontractor – Construct Bridge

Scope:
Construct unique fiberglass arch structure bridge in only 9 working shifts.


Johnson Parkway and SR305 Roundabout

Contract Value:
$1,025,254

Our Role:
Subcontractor – Precast Concrete Erection and CIP Concrete

Date:
2020-2023

Scope:
Erect 350LF precast concrete fascia panel retaining wall, construct CIP decorative sign wall in roundabout island, CIP retaining wall along pedestrian walkway adjacent to tunnel crossing.


Lake Sammamish State Park

Owner:
WA State Parks

Our Role:
Subcontractor – Cast in Place Concrete and Picnic Shelters.

Date:
2023-2024

Scope:
Construct 4 picnic shelters with CIP columns and beams, custom carpentry including teak benches.